top of page

Two ABM Members Team Up for New Bahamas Project


Hurricane Hole Superyacht Marina at Paradise Landing

Selects ABM Allied Member Bellingham Marine for Concrete Floating Dock System


ABM Members Bellingham Marine and Hurricane Hole Superyacht Marina at Paradise Landing are working together on what promises to be the most exclusive berth in The Bahamas. Just one of the many benefits of being an ABM marina member and / or an allied member is networking with top companies in our industry.


Bellingham will supply and install the floating concrete dock system that

features 6,100 feet of docks up to 420 feet, the marina will have a 240’ turning radius, 13.5’ depth and an extensive array of amenities and services for yacht owners, captains and crew.


Bellingham’s Unifloat® Concrete Floating Dock System has proven ecological benefits, including a small carbon footprint from manufacturing, and water quality benefits through marine habitat creation. Manufactured in Jacksonville, Florida, the Unifloat® Concrete Dock System is custom designed for Hurricane Hole. Bellingham Marine will employ local Bahamian labor during the installation process.


As a five-star destination and home port, the Hurricane Hole Superyacht Marina will provide 24-hour security, on-site Customs & Immigration services, 400-amp, 480-volt power, fuel and pump-out service, laundry, shower, and dressing room facilities with expected completion in the final months of 2021.


See all ABM Marina Services Allied Members, like Bellingham Marine.


If you are interested in joining the ABM, visit https://www.bahamasmarinas.com/membership



184 views0 comments

Recent Posts

See All
bottom of page